Join the 155,000+ IMP followers

NSK

  www.nskeurope.com

Timber plant reduces downtime with NSK linear guides

Thanks to the adoption of NSK's linear guides with K1 lubrication units, a timber manufacturer managed to reduce conveyor downtime by a factor of more than 12, prompting annual cost savings of more than €77,000.

Join the 155,000+ IMP followers

International